Gaston Green is a Bermuda grass field with a road and a parking lot in its middle. Part of it is an off-leash dog area, and a large Chinaberry stands at its southwest edge. A plan Austin City Council approved on Nov. 5 lists that Chinaberry, along with the Chinaberry and Ligustrum on the Lamar-side bank to the east, as a high priority for removal. The same plan identifies several trees at Gaston Green that need removal or heavy pruning for safety.
That level of detail runs through the whole document. The operations and maintenance phase plan moves day-to-day care of Pease District Park from Austin Parks and Recreation to the Pease Park Conservancy, which until now formally ran only the seven acres of Kingsbury Commons. Community Impact reported that the Parks and Recreation Board backed the change unanimously this fall before Council signed off. For anyone in Pemberton who walks the park, the first year changes a lot of small, regular upkeep. It leaves the biggest items alone. The trail you are detouring around, the trees overhead and Shoal Creek itself all stay with the city.
The Line the Plan Draws
The plan keeps the division of work that has guided the partnership since the 2023 agreement. The Conservancy runs and maintains anything it builds or adds to the park. The city keeps primary responsibility for the urban forest, the built trails, Shoal Creek and the park roads. On the trails, the Conservancy only helps with minor repairs to the east and west decomposed granite paths. It would treat any major repair or replacement as a capital project under its agreement with the city.
Pease remains fully public parkland. According to Community Impact, the Conservancy now takes the lead on facilities maintenance, trash collection, volleyball court upkeep, graffiti removal, programming and volunteer coordination. Conservancy CEO Nicole Netherton told Council on Nov. 5 that "our operations team is in the park every day and can respond quickly to maintenance and visitor needs," as quoted in the same Community Impact story.
The plan names the 12 zones the Conservancy takes on in the first year of this expansion: North Ramble, Windsor Hillside, Polecat Hollow, Caswell Shoals, Live Oak Meadow, Wooten Woods, Live Oak Terrace, Gaston Green, Ramble Scramble, Lamar Slope, Lamar Terrace and The Bluffs. Together they cover about 67 acres. Its staff will empty the trash, recycling and dog-waste stations once every weekday. The plan adds 92 hours a week of Conservancy staff time for that first year and includes no capital improvements.
Polecat Hollow, Where Lamar Sees the Park
The plan calls Polecat Hollow "arguably the most visible image of Pease Park along Lamar Boulevard." It has an open lawn, three sand volleyball courts and a mesquite grove just north of the MLK and Lamar intersection. In the first year, the Conservancy takes over the three courts and the four picnic tables there. Its year-one budget sets aside $6,500 for court equipment, backup equipment and maintenance. The longer-term goal for the field is to turn its western edge into riparian woodland and to prune the mesquite grove carefully so planned swales do not harm it.
The bigger ideas for Polecat Hollow come from the 2014 Vision Plan. They include a formal park entrance from the MLK intersection, an amphitheater, and new pedestrian bridges linking Kingsbury Commons and Live Oak Meadow into a Pease Park Loop. The phase plan puts irrigation and any new structures at Polecat Hollow in Phase IV. It says each zone will move through stages over 15 to 20 years, with timing set by budget, and that every Vision Plan idea will be reassessed and taken through public engagement before any agreement to build is proposed.
Live Oak Meadow and the Kissing Tree
The plan describes Live Oak Meadow as a major entry point to the park and greenbelt. It is also where Patrick Dougherty's Stickwork piece, Yippee Ki Yay!, stands south of 24th Street. The plan says heavy foot and dog traffic has worn the meadow down. It calls for plantings between the main trail and the creek that steer walkers to formal creek access points.
One of the smallest lines in the year-one budget belongs to this zone: $1,000 for decomposed granite for steps and mulch for the trail bumpout at the Kissing Tree and newly planted trees. The budget also sets aside $1,300 for picnic tables and that same Live Oak bumpout. The Conservancy also takes on the existing safety railings in Live Oak Meadow and The Bluffs. A $3,000 line covers renting a power-washer trailer to clean graffiti off hard surfaces in Live Oak Meadow and Gaston Green.
The historic bridges at 24th and 29th streets are the exception. The Conservancy removes graffiti everywhere else, and any work on those two bridges is coordinated with the city.
The Slopes Get the Biggest Check
The largest single item in the $259,000 year-one budget is $58,000 to remove bamboo at Ramble Scramble, which covers seeding, planting, chipping and watering. That is more than the entire volleyball, picnic table, graffiti and trash supply lines combined. Staff wages, including a new full-time operations tech, take $181,000. Tree care outside Kingsbury Commons gets $6,000 for structural pruning and deadwood removal.
The quieter wooded zones get restoration work and no new construction. North Ramble is a slope forest of Texas ash and Ashe juniper. Windsor Hillside sits at one of the park's highest points above Shoal Creek and has been under a long-term invasive-plant restoration with the city's Urban Forestry program and Texas Conservation Corps since a 2023 approval. The plan lists no future improvement projects for either zone.
What Gaston Green Waits For
Gaston Green's year-one list is the same as most zones: invasive plant removal, native planting, graffiti cleanup, and the trash, recycling and dog-waste stations. The plan also asks for more riparian and woodland cover around the parking lot. It mentions that the park edge and creek next to nearby homes have been a frequent concern raised with the city, and that the Conservancy will focus restoration and native planting there.
The changes dog owners would notice most come later. Phase III, which also covers Ramble Scramble, Lamar Slope and Lamar Terrace, lists mowing at Gaston Green, lawn irrigation, and water for both dogs and people. Lamar Terrace, at 29th and Lamar, is where David Deming's Mystic Raven stands, and Phase III allows for possible new structures there too. The first new park-wide project is a comprehensive signage plan. According to Community Impact, it runs into 2027, with new Conservancy hires expected in 2027 and 2028.
The Trail Runs on the City's Schedule
Because built trails stay with the city, Shoal Creek Trail closures inside Pease follow Austin Parks and Recreation's timeline, not the Conservancy's. The trail between Shoal Creek Boulevard and the Janet Fish Bridge closed April 27 for resurfacing and accessibility repairs. The Shoal Creek Conservancy's closure page gives an estimated timeframe through November 2026 and notes that permitting delays and crew availability pushed the work past the city's original late-June estimate. The posted detour is the sidewalk on the west side of North Lamar between Shoal Creek Boulevard and 29th Street.
Further south, the landslides of May 2018 and May 2019 still block the trail from about 26th to 27th Street. The detour is the paved sidewalk on the east side of the creek along North Lamar. The city has folded the site into the South Gap segment of its 24th–34th Street trail connectivity project, which is in design. The plan describes Gaston Green as just north of that slope failure and the closed nature trail.
The one segment that is finished sits at the park's north end. The city completed the 29th–31st Street Middle Gap in July 2026, three months early. It has a widened 12-foot shared path and, along part of the route, a separate 10-foot terracotta bike path. The park itself runs along Shoal Creek from Kingsbury Street to 31st Street, so the Middle Gap ties into its northern edge.
On the Conservancy's Calendar
The Pease Park Conservancy's upcoming events page lists free programming and volunteer days through the holidays:
- Morning Garden Care, Saturday, Nov. 28
- Operations Sunday in Kingsbury Commons, Nov. 29
- Birding at Pease Park, Dec. 4
- Cycle the City, Dec. 5
- A honky-tonk two-step lesson and dance party, Dec. 6
- Toddler yoga, Dec. 9 and Dec. 16
- A puppet show, Dec. 12
- Sunday Social yoga and coffee, Dec. 13
- A Project WILD educator workshop, Jan. 10
- An MLK Day food-and-diaper drive, Jan. 18
For more on how parkland decisions are shaping the west side of Central Austin, our look at the vote to save Muny follows a separate agreement a few miles west, and our 78703 page covers homes around the park.
If you live near Pease and are thinking about how a few minutes' walk to Gaston Green or Live Oak Meadow fits into your next move, Lesley Taylor is glad to talk it through with you. Let's connect.